A Review After the First Month

5.0
★★★★★

"After the first month of operation with the new climate control system, the reduction in fixed energy consumption was 19%. The installed luminous flow indicators in the stainless steel ducts allow us to see any deviation in real time. The GreenAirQatar team adjusted the mechanical ventilation parameters according to our actual loads, not generic tables. The difference is noticeable both in the bill and in the thermal sensation in the production area."

JM
Jorge Mendoza Maintenance Engineer · Food Processing Plant
Context: Operational technical audit and optimization of industrial climate control in a 2,800 m² facility. Project completed in January 2025.
Customer Review

A Review After the First Month

Operations in a 12,000 m² air-conditioned commercial complex


The first month of operation with the redesigned stainless steel duct system and the new flow indicator lights yielded measurable results. Before the intervention, the complex recorded a baseline consumption of 184 kW during peak air conditioning hours. After tuning the motorized dampers and calibrating the differential pressure sensors, that value stabilized at 142 kW.

The 22.8% reduction in fixed electrical demand was not the only change. Maintenance staff reported that the visual alerts on the control panels allowed them to identify two partial filter blockages before they affected airflow. This prevented unscheduled downtime and extended the replacement cycle of the filter elements.

The estimated monthly savings on the bill is around 1,200 USD, although the exact figure will depend on thermal load variations in the coming months. For the GreenAirQatar technical team, the key point is that the continuous monitoring scheme is already generating operational decisions without relying on periodic visual inspections.

Review Details
  • Client: Al Wakra Commercial Complex
  • Area: 12,000 m² air-conditioned
  • Intervention: Duct redesign + flow sensors
  • Consumption reduction: 22.8% in fixed demand
  • Next step: Heat recovery audit